body>

Sample menu:

Projects (download PDF)

When in Section I (1987-1995), I was theme responsible for the projects:

60-90-20 – Measurement and control system for air radioactivity monitoring and supervision, stage 'development and testing work programs', deadline 10/06/1992

Contract 681C, Theme A4, in 1992

Contract 150B Theme A52, in 1992

Contract 681C, Theme 66

60-90-22

10122 for Nuclear Plant unit U1 Summ 1.889.125 lei

FM-05/6418 specifications for the construction and installation, the permitting process

12076 Contract responsable, 50,000 lei, for "Programs for application, wear measurement method with radioactive tracers TIMKEN car with computing system that uses SPOT - 83 ', deadline 09/30/1988

10122 for Nuclear Plant units U1+U2

10127 for Nuclear Plant unit U1

10252 for Nuclear Plant unit U3

60-90-21

While working at Section I, I colaborated on projects:

60-91-54

60-90-1

65-90-45

62-91-6

60-91-56

60-91-49

60-91-43

83-91-31

83-91-41

Standards, specifications, test reports

1. Technical Study: System for the detection and measurement of radioactive noble gases 60-90-21

2. Technical Procedures: Functional Testing for gaseous effluent Monitor AC-PT-01-18 (Approved)

3. Technical procedure: calibration for the gas effluent monitor equipment MEG1 AC-PT-01-19 (Approved)

4. Standard branch - gaseous effluent monitor STR-CSEN-132-89 (Approved)

5. Standard branch: Cartridge filter with active coal STR-CSEN-211

Plus

Technical assistance tracking records (total number of 11 pannels and assemblies)

While working for my PhD thesis at Section III, I collaborated to the below progects:

1. M. Petrascu, C.Bordeanu, A.Isbasescu, H.Petrascu, F.Negoita, L. Marinescu

Energetic calibration for the TANDEM accelerator (1999) using analog izomer isobar resonance in 13N, 14.214 MeV, by elastic scattering on carbon –

4940/18.11.1999 SUMM : 164.7125.267 lei

2. M.Petrascu, H.Petrascu, A.Isbasescu, C.Bordeanu

Extension '0' alignement for the TANDEM accelerator (1999)

3. M. Petrascu, C.Bordeanu, A.Isbasescu, H.Petrascu, R.Dima, L. Marinescu

Gas purity from inside the TANDEM accelerator measurements(2000)

4. M. Petrascu, C.Bordeanu, A.Isbasescu, R.Ruscu

Neutron Scintillation probes characterization using a 241AmBe neutron source (1999)

5. M. Petrascu, C.Bordeanu, A.Isbasescu, R.Ruscu

Neutron Scintillation probes characterization using deuteron beams from the TANDEM accelerator (d+Au) (1999)

6. M. Petrascu, C.Bordeanu, A.Isbasescu, H.Petrascu

Biological probes characterization using ERDA method (bones, brain tissue) (1998-2000)

7. M. Petrascu, D.Pantelica, C.Bordeanu, A.Isbasescu, H.Petrascu

Thin sample profiling using nuclear methods (1998-2000)

8. C. Bordeanu

Programs for experimental data analysis in beam by recoil atoms element analysis (1999)

9. M. Petrascu, C.Bordeanu, A.Isbasescu, I.David

Characterization of material impurities by atoms recoil method (1997) 16O+27Al

10. A.Fomicev, M.Petrascu, C.Bordeanu

Energy calibration and efficiency curves for thick Si detectors for Dubna

11. C.Bordeanu

Programs for determining the pre-emission probability for the halo neutrons for the fusion of 11Be with light and heavy targets (1998)

12. C.Bordeanu

Programs for determining the pre-emission probability for the halo neutrons for the fusion of 11Be with light and heavy targets (1999)

Grants

1. M.Petrascu, A.Isbasescu, H.Petrascu, C.Bordeanu, I.Cruceru, M.Giurgiu, I.Tanihata

Experimental measurements and theoretical calculations for the neutron pre-emission when halo nuclei interract with light targets

SCIENCE ACADEMY GRANT 79/1999 (January)

Summ: 17 million lei

2. M.Petrascu, A.Isbasescu, H.Petrascu, C.Bordeanu, I.Cruceru, M.Giurgiu, I.Tanihata

Halo 11Li nuclei fusion investigation to Si light targets in energy range 15-25 AMeV

GRANT ANSTI 5194/1999 (3 years)

For 1999 year, summ: 25 million lei

Unique product used abroad

1. M Petrascu, C.Bordeanu, I.Cruceru, A.Isbasescu, D.Mangeac, R.Ruscu, H.Petrascu, C.H.Giolu

Array neutron detector: design and construction, delivered to RIKEN-Japon (I.F.I.N. 1997-2000)

International experimental arrangement

1. M.Petrascu, C.Bordeanu, I.Cruceru, A.Isbasescu, R.Ruscu, H.Petrascu, M.Giurgiu, I.Tanihata, A.Ozawa, K.Morimoto

International experimental arrangement for the halo 11Li nuclei fusion investigation to light targets – accomplished at RIKEN-Japon in 2000

Member of a research team responsible for the development of an international project

1. Collaboration to Institute of Physical and Chemical Research RIKEN-Japon (1997-2000)

Contract

Financial value IFIN-HH

Financial value for Cristina Bordeanu

Contract’s responsible

2005 - return to Romania

---

---

--

IMPACT Accelerator based laboratory in a salt mine for stellar processes understanding

Dr.Florin Negoita

CEEX M3 nr.165/2006

5996.07 ron

2554.00

(2006)

Dr.Florin Carstoiu

PN 06 35 02 01

1635875.00 ron

31459.00

(2006)

Dr. Dan Pantelica

CEEX M3 nr.165/2006

53416.8 ron

17399.00

(2007)

Dr.Florin Carstoiu

PN 06 35 02 01

2618000.00 ron

17425.00

(2007)

Dr. Dan Pantelica

CEEX 05 D10 71

1115929.66 ron

1389

(2007)

Dr.Florin Negoita

CORINT EURISOL 80

3100000.00 ron

11686

(2007)

Dr.Florin Negoita

PN 06 35 02 01

7037211.00 ron

27135

(2008)

Dr. Dan Pantelica

CORINT EURISOL 80

3100000.00 ron

9852

(2008)

Dr.Florin Negoita

American Physical Society’s International Travel Grant 2008

$1000

~$4500

(2008)

Dr.Michael Famiano

Dr. Cristina Bordeanu

PN 09 37 01 05

Dr.Nicolae Marginean

EuroGENESIS (ESF) – CRP3, IP6

Winner, no implementation

2010-2013

Dr.Cristina Bordeanu

NKTH-OTKA-EU FP7 (Marie Curie Actions)., HUMAN-MB08 B

24.000.000 HUF (~100.000 euro)

2010-2012

Dr. Cristina Bordeanu


During my studies at the Faculty of Electrical Engineering, I participated to student scientific communication session, where I won a prize II. The graduating project was “Numerical control for driving a synchronous motor for self-driving”.

The double placements at college graduation made me work one period to the Enterprise of apparata for electrical installations - Titu, through rotation by all company departments. When I moved to ICPE in 1983, I was working on ultrafast fuses and Design department at Titu. To make me remain at IAEI-Titu, the general director of the company, at that time, proposed me to become head of the department of ultrafast fuses, which I refused.

From 1983 to 1987, I worked at the Institute of Design and Research for Electrotechnique, Computer Center.

During this period I worked on:

• Computerized acces to the pieces of the warehouse (FORTRAN) (collaboration)

• a computer-design asynchrone motors (FORTRAN) (collaboration)

•-systematization of the types of laminations for electric rotary machines and transformers using the computer (FORTRAN) (collaboration)

• Designing and execution-diagnosis for the thyristor-metro (ASM 8080) (collaboration)

• Investigation and diagnosis program for the control equipment for the thyristor-metro (collaboration)

• design and execution of the drive system for DC micromotor MAA13/6000 (in charge of the theme)

•- software package for measuring the deviations from circularity, perpendicularity, flatness, parallelism, concentricity of the cylindrical parts on a turntable (FORTRAN + ASM 8080) (collaboration)

I moved from the ICPE to IFIN, in 1987, as I was following the evening courses of the Technology Faculty of Physics, Magurele, starting in 1985.

From 1987 to October 1995, at IFIN, I worked in Section I, known at that time as “nuclear electronics” or "Nuclear Instrumentation and Methods", as part of the "Dosimetry and Radiological Environmental Monitoring" team.

Here I realized:

M. Duma & B. Savu © 2013 DFN IFIN-HH